TWIM Electric Bill Rationalization Solution
TWIM Energy Saving Project
Approved by KEPCO
100% Pre-investment by TWIM
0KRW
No Initial Costs for Businesses
*Based on KEPCO's Basic Supply Terms and the Enforcement Rules of the Electricity Business Act
100% upfront investment with TWIM's own funds
Industrial sites with high-voltage contract power between 300kW and 1,000kW (based on KEPCO billing)
No initial cost for businesses; replaced by savings in electricity bills
AC & three-phase & low-voltage supply
By analyzing and diagnosing energy usage and proposing optimal electrical installations, customers can achieve a 20-30% reduction in electricity bills.
Removing outdated substation facilities can prevent power outages and electric shocks, while also optimizing substation space.
Customers can reduce the cost of regular inspections such as safety construction job notices, and the cost of replacing high-voltage switchboards and transformers.
Responsibility for electrical installations is transferred to KEPCO, enabling quick response in case of a power outage.
TWIM Energy Saving Project
Contract power supply is limited to less than 1,000kW.
Provision of site for KEPCO transformer (required)
Installed close to the ground due to management restrictions on power supply facilities (indoor or rooftop installation is not allowed)
If the business site is relocated, the customer bears the cost of relocating the transformer.
(KEPCO's Basic Supply Terms and the Enforcement Rules of the Electricity Business Act)