TWIM Electric Bill Rationalization Solution is a project that reduces electricity bills by changing the power receiving facilities
that receive electric energy from Korea Electric Power Corporation to a capacity optimized for the workplace.

TWIM Electric Bill Rationalization Solution

TWIM Energy Saving Project


TWIM Electric Bill Rationalization Solution
significantly reduces industrial electricity bills by 20-30% every month without any cost to the customer.
TWIM Electric Bill Rationalization Solution

Approved by KEPCO

100% Pre-investment by TWIM

0KRW

No Initial Costs for Businesses

*Based on KEPCO's Basic Supply Terms and the Enforcement Rules of the Electricity Business Act

Overview
TWIM Electric Bill Rationalization Solution changes industrial high-voltage electrical installations to industrial low-voltage installations to drastically reduce industrial electricity bills. TWIM invests all project costs upfront and recovers the costs through the savings in electricity bills after the project.
  • Project Method

    100% upfront investment with TWIM's own funds

  • Project Target

    Industrial sites with high-voltage contract power between 300kW and 1,000kW (based on KEPCO billing)

  • Project Cost

    No initial cost for businesses; replaced by savings in electricity bills

  • Contract Power Supply Method

    AC & three-phase & low-voltage supply

Project Process
01Due diligence and Diagnosis
  • Energy diagnosis of customer facilities
  • Analysis of power usage and savings through KEPCO customer number and KEPCO power planner
  • Submission of a free energy diagnosis report
02Feasibility Review
  • Analysis of savings and business feasibility
  • On-site inspection by KEPCO
  • Cost estimation
03Proposal and Contract
  • Negotiation of proposals with customers
  • Contract progress
04Construction and Completion
  • Design, construction, supervision (ESCO specialist company, registered as an electrical contractor)
  • KEPCO transformer supply
  • Inspection approval by Korea Electrical Safety Corporation
05Fund Execution
  • Collection after verification of savings effect
  • Direct collection of proposals
06Post-Management
  • 3 years of free post-management (submission of warranty bond)
  • Savings verification through KEPCO electricity bill statements
Features of the Electric Bill Rationalization Solution
Electricity Cost Reduction

By analyzing and diagnosing energy usage and proposing optimal electrical installations, customers can achieve a 20-30% reduction in electricity bills.

Safety Accident Prevention

Removing outdated substation facilities can prevent power outages and electric shocks, while also optimizing substation space.

Regular Cost Reduction

Customers can reduce the cost of regular inspections such as safety construction job notices, and the cost of replacing high-voltage switchboards and transformers.

Quick Response

Responsibility for electrical installations is transferred to KEPCO, enabling quick response in case of a power outage.

TWIM Electric Bill Rationalization Solution

TWIM Energy Saving Project

  • Capacity Limitation

    Contract power supply is limited to less than 1,000kW.

  • Site Provision

    Provision of site for KEPCO transformer (required)

  • Installation Restriction

    Installed close to the ground due to management restrictions on power supply facilities (indoor or rooftop installation is not allowed)

  • Relocation Restriction

    If the business site is relocated, the customer bears the cost of relocating the transformer.

Business based on legal basis

(KEPCO's Basic Supply Terms and the Enforcement Rules of the Electricity Business Act)